If you have comments and/or questions related to Vicksburg District’s Section 508 program or if you have concerns related to the Section 508 ICT accessibility of any content or the user interface on this website, please send an e-mail to VicksburgDistrict@USACE.Army.mil. Where applicable, please include in your e-mail the web address or URL and the specific accessibility barrier(s) you are encountering.

Results:
Archive: 2015
Clear
  • District Hosts Founder’s Day

    VICKSBURG, MISS…The U.S. Army Corps of Engineers Vicksburg District (District) recognized team members with 20, 25, 30, 35, and 40 years of service and some Vietnam veterans at its recent Founder’s Day ceremony held at headquarters building. The ceremony was in commemoration of the District’s 142 years of service to the nation. Retirees, including those who are Vietnam veterans, were also recognized at the ceremony. A breakfast for retirees was held in the executive conference room prior to the ceremony.
  • Corps’ Vicksburg District Hosts a Blessing of the Fleet

    Vicksburg, Miss…The U.S. Army Corps of Engineers Vicksburg District’s Mat Sinking Unit (MSU) will leave the harbor for its annual revetment season on September 9, 2015 at 10:00 A.M. The District will host a Blessing of the Fleet ceremony on September 9, 2015 at approximately 10:15 a.m. at the Vicksburg City Water Front as the MSU departs.
  • Riverton Recreation Swim Area Re-opens

    VICKSBURG, MS… The Riverton Recreation swim area repair is now complete and open to the public. The swim area was closed due to a broken depth marker. The depth marker had broken/jagged metal that would be dangerous if the area remained opened to the public. The boat ramp, playground area, pavilions, and comfort station remain open to the public.
  • Steele Bayou Flood Control Structure to open this week

    VICKSBURG, Miss… The Steele Bayou Flood Control Structure will be opened Saturday, August 8, 2015. The Steele Bayou structure is located north of Vicksburg and was built in 1969 to provide backwater flood protection from the Yazoo and Mississippi rivers.
  • District Announces Chief of Construction and A&E Branch of Contracting Division

    VICKSBURG, MISS…The U. S. Army Corps of Engineers Vicksburg District recently announced the selection of Ellis Screws as chief of its Construction and A&E Branch of the Contracting Division.
  • Mississippi River Commission schedules low-water inspection trip

    VICKSBURG, Miss., July 23, 2015 -- The Mississippi River Commission will conduct its annual low-water inspection trip on the Mississippi River August 8-21, 2015. Four public meetings have been scheduled aboard the Motor Vessel MISSISSIPPI in selected towns along the river so commission members have the opportunity to meet with local partners, stakeholders and residents and hear their concerns, ideas and issues.
  • Riverton Recreation Area Swim Beach Temporarily Closed

    VICKSBURG, MISS… Due to a broken depth marker in the swimming area at Riverton Recreation Area (RRA), the US Army Corps of Engineers (Corps) has temporarily closed the swimming area effective immediately. The depth marker has broken/jagged metal that would be dangerous if area remained opened to the public.
  • District Announces Annual Engineer’s Day Awards

    Vicksburg, Miss… The U. S. Army Corps of Engineers’ Vicksburg District recently hosted its annual Engineer’s Day Awards ceremony at District Headquarters.
  • Vicksburg District Prepares for July High River Stages

    Vicksburg, Miss… While the forecasted stages for the Mississippi River are relatively low compared to the Great Flood of 2011, stages are predicted to reach Phase I flood fight preparation levels in much of the District. The current forecast is for the river to crest at 45 feet on July 17 on the Vicksburg gauge. It is somewhat unusual for the river to be this high this time of year. In fact, it was 1928 the last time the Vicksburg gauge was higher than the current forecasted crest in the month of July. But in comparison, this crest is still over 12’ lower than it was during the spring flood of 2011. The river reached a crest of 43 feet on the Vicksburg gauge in April this year.
  • Vicksburg Corps Opens Riverton Beach for Summer Visitors

    Vicksburg, Miss…The Louisiana Field Office (LFO) of the Corps of Engineers Vicksburg District will open the Riverton Recreation area beach for the Fourth of July weekend. The 13-acre area recreational area, which is open year round, is located north of Riverton, Louisiana, on the Ouachita River. The swim beach will open July 3, 2015 and normally operates until mid-September. Riverton is the only recreational area with a swim beach within the LFO and on the Ouachita Black River system. Picnic sites, a picnic shelter, playground, boat ramp, and restroom facilities are also available.