Vicksburg, Miss… – Repairs to the Pearl River Navigational Canal Lock #2 are expected to be completed ahead of schedule by November 20, 2013. The repair work included backfilling the erosion damages to the east bank along the lock chamber, installing a concrete ditch slope drain, turfing, and repairing the damaged security fence.