The Yazoo Area Pump Project is a part of the Yazoo Basin, Yazoo Backwater, Mississippi, Project, which was authorized by the Flood Control Act of 1941. The pump project is the only feature that remains unconstructed. The USACE Vicksburg District is committed to developing sustainable solutions to flooding in the South Delta.