If you have comments and/or questions related to Vicksburg District’s Section 508 program or if you have concerns related to the Section 508 ICT accessibility of any content or the user interface on this website, please send an e-mail to VicksburgDistrict@USACE.Army.mil. Where applicable, please include in your e-mail the web address or URL and the specific accessibility barrier(s) you are encountering..

Results:
Tag: Maintenance Activities
Clear
  • USACE Vicksburg District begins drawdown of Thatcher Lock and Dam

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers Vicksburg District will begin pool draw down at Thatcher Lock and Dam on Nov. 19, 2021, to make repairs to the seal of the hinge crest gate. The pool at Thatcher Lock and Dam is expected to fall as much as six inches per day, from 77 to 72 feet. The USACE Vicksburg District is working with City of Camden personnel to create a slower draw down from 73 to 72 feet to closely monitor the city’s water supply intake pipes. It is possible that the draw down might have to continue to 71 feet if the inspection cannot be completed at 72 feet.
  • USACE Vicksburg District announces closure to Arkabutla Intake Gates

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers (USACE) Vicksburg District announces that they will close the intake gates at Arkabutla Dam for a brief time beginning July 23rd. This closure will take place so that routinely scheduled inspections can be completed inside the outlet tunnel and during that time no water will be flowing through the outlet channel. The closure is expected to last less than one week and will have a minimal impact to recreation in the area. One small parking lot adjacent to the outlet channel will be closed during the event.