If you have comments and/or questions related to Vicksburg District’s Section 508 program or if you have concerns related to the Section 508 ICT accessibility of any content or the user interface on this website, please send an e-mail to VicksburgDistrict@USACE.Army.mil. Where applicable, please include in your e-mail the web address or URL and the specific accessibility barrier(s) you are encountering.

Results:
Tag: Thatcher
Clear
  • USACE Vicksburg District begins drawdown of Thatcher Lock and Dam

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers Vicksburg District will begin pool draw down at Thatcher Lock and Dam on Nov. 19, 2021, to make repairs to the seal of the hinge crest gate. The pool at Thatcher Lock and Dam is expected to fall as much as six inches per day, from 77 to 72 feet. The USACE Vicksburg District is working with City of Camden personnel to create a slower draw down from 73 to 72 feet to closely monitor the city’s water supply intake pipes. It is possible that the draw down might have to continue to 71 feet if the inspection cannot be completed at 72 feet.
  • UPDATE #1 - USACE Vicksburg District Thatcher Lock and Dam public notice

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers (USACE) Vicksburg District continues to monitor river levels near Thatcher Lock and Dam (L&D), where pool elevation has fallen below normal pool level due to a leak in the seal of the hinge crest gate.
  • USACE Vicksburg District Thatcher Lock and Dam public notice

    The U.S. Army Corps of Engineers (USACE) Vicksburg District Thatcher Lock and Dam (L&D) pool elevation has fallen below normal pool level and is continuing to fall, due to a leak in the seal of the hinge crest gate. This is of no danger to the integrity of the structure but will cause Thatcher’s pool to continue to fall until the pool reaches elevation 71 ft, which is the bottom elevation of the gate. Thatcher’s pool is currently at an elevation of 75.8 ft and is falling between 0.25 ft and 0.35 ft each day. If this rate continues, Thatcher’s pool will fall as low as 72.5 ft by the end of October and reach 71 ft near the first weekend in November.