If you have comments and/or questions related to Vicksburg District’s Section 508 program or if you have concerns related to the Section 508 ICT accessibility of any content or the user interface on this website, please send an e-mail to VicksburgDistrict@USACE.Army.mil. Where applicable, please include in your e-mail the web address or URL and the specific accessibility barrier(s) you are encountering..

Interim Repairs near completion at Arkabutla Dam; Study underway for long-term solutions
Vicksburg, Miss – The U.S. Army Corps of Engineers Vicksburg District (USACE-MVK) continues to advance interim risk reduction measures (IRRM) at Arkabutla Dam in Northwest Mississippi that are scheduled to be completed by late September 2024. These measures include adding piezometers to increase real-time monitoring of groundwater pressure and installing relief wells to relieve water pressure and to allow excess water to be diverted safely.

Download Image: Full Size (2.46 MB)
Photo by: N/A |  VIRIN: 240822-D-CE999-002.JPG