If you have comments and/or questions related to Vicksburg District’s Section 508 program or if you have concerns related to the Section 508 ICT accessibility of any content or the user interface on this website, please send an e-mail to VicksburgDistrict@USACE.Army.mil. Where applicable, please include in your e-mail the web address or URL and the specific accessibility barrier(s) you are encountering..

John H. Overton Lock and Dam Dewatering
190926-A-HE363-1185 Personnel from the U.S. Army Corps of Engineers Vicksburg District inspect and perform maintenance during a complete dewatering of the John H. Overton Lock and Dam, located on the Red River near Alexandria, Louisiana, Sept. 26. The dewatering of the lock and dam allowed district engineers and technical experts to inspect the lock chamber’s components, perform maintenance and make repairs. Since the construction of the lock and dam in 1982, the lock chamber has never been completely dewatered.

Download Image: Full Size (6.64 MB)
Tags:
Photo by: Jared Eastman, Visual Information Specialist |  VIRIN: 190926-A-HE363-1185.JPG