NOTICE:LINDY C. BOGGS LOCK AND
DAM (LOCK AND DAM #1) - MILE 40.0 ON THE RED RIVER, IS CURRENTLY CLOSED
FOR REPAIRS TO THE DOWNSTREAM MITER GATE AND WILL REMAIN CLOSED FOR APPROXIMATELY
TWO WEEKS.
(Click
thumbnail for larger image.)
Lindy C. Boggs Lock and Dam
(L&D #1)
Mile 43.8
Maximum
Tailwater Stage For Lock Operation: 58.0 Ft. NGVD Lock
Status: OPEN
Communications
(VHF): MB 12/16
(318) 253-8922
Lockmaster: Bobby Coco
John H. Overton Lock and Dam
(L&D #2)
Mile 74.5
Maximum
Tailwater Stage For Lock Operation: 72.5 Ft. NGVD Lock Status: OPEN
Communications (VHF):
MB 12/16
(318) 443-9625
Lockmaster: Richard Daigrepont
Lock and Dam #3
Mile 116.5
Maximum
Tailwater Stage For Lock Operation: 90.5 Ft. NGVD Lock Status: OPEN
Communications (VHF):
MB 12/16
(318) 627-2944
Lockmaster: Jimmy Hayes
Russell B. Long Lock and Dam
(L&D #4)
Mile 168.5
Maximum
Tailwater Stage For Lock Operation: 119.0 Ft. NGVD Lock
Status: OPEN
Communications (VHF):
MB 12/16
(318) 932-6960
Lockmaster: David Fletcher
Joe D. Waggonner, Jr. Lock and Dam
(L&D #5)
Mile 200.0
Maximum
Tailwater Stage For Lock Operation: 138.5 Ft. NGVD Lock Status: OPEN
Communications (VHF):
MB 12/16
(318) 797-9519
Lockmaster: Melton Gregory