Who We Are    Mission    Do Business With Us    Recreation    Projects    Crayon--Kids Corner link
uasce logo photo Relevant, Ready, Responsive, Reliable

.
Mission and Mission Essential Tasks
Customers
Projects
Summary of Capabilities
Unique Capabilities
Quality Control
Dam Safety


Natchez Bluff Stabilization

Centuries old landslides threatening historic Natchez, MS homes are being stabilized at this 150-180 foot bluff. Soil nail and mechanically stabilized walls are used in the remediation.

 

Mississippi River Levee Relief Wells

Underseepage control method to relieve excess pressures underneath several Mississippi River levees (Commerce-Memphis District; Waterproof, Tallulah-Magna Vista-Vicksburg District). Use of vibratory method of installation by combination of contract and in-house labor reduces cost to $8-10,000 per well.

 

Grenada Dam Relief Wells

Replacement of eight 14-inch diameter relief wells 120 feet in depth in the outlet channel to relieve excess heads. Installation was performed by in-house drilling crews and lake personnel.

 

Sardis Dam Remediation

Seismically deficient due to potential liquefaction of foundation cohesive soil. Remediation measures consisted of an upstream stability berm and upstream concrete piles to stabilize the hydraulically filled dam during an earthquake from the New Madrid region.





POC
Content

US Army Engineer District, Vicksburg
Public Affairs
601-631-5053
cemvk-pa@usace.army.mil


Technical
Webmaster
webmaster-mvk@mvk02.usace.army.mil
Contact Us | Disclaimer | Privacy/Security